GNLPSL0013
Representation ID: 17047
Received: 14/11/2018
Respondent: South Norfolk Council
PLOT 2
There is a low surface water flood risk running NW to E across the site. Depths are identified as below 300mm.
PLOT 2
There is a low surface water flood risk running NW to E across the site. Depths are identified as below 300mm.
Object
New, Revised and Small Sites
GNLP2052
Representation ID: 17050
Received: 14/11/2018
Respondent: South Norfolk Council
Both sites on surface water flood flow path affecting approx. 50% of northern site and approx. 85% of southern site.
Northern site - depths between 300-900mm for high (up to 1 in 30yr)medium (between 1 in 30 & 1 in 100yr) and low (between 1 in 100 & 1 in 1000yr)risk events. the whole of the frontage of the site affected by all events.
Southern site - depths generally below 300mm for high and medium risk events and between 300mm & 900mm for low risk events
Both sites on surface water flood flow path affecting approx. 50% of northern site and approx. 85% of southern site.
Northern site - depths between 300-900mm for high (up to 1 in 30yr)medium (between 1 in 30 & 1 in 100yr) and low (between 1 in 100 & 1 in 1000yr)risk events. the whole of the frontage of the site affected by all events.
Southern site - depths generally below 300mm for high and medium risk events and between 300mm & 900mm for low risk events
Object
New, Revised and Small Sites
GNLP2053
Representation ID: 17051
Received: 14/11/2018
Respondent: South Norfolk Council
As advised on comments for site "East of The Street.
Site on surface water flood flow path - 50% of site at risk.
Depths between 300-900mm for high (up to 1 in 30yr)medium (between 1 in 30 & 1 in 100yr) and low (between 1 in 100 & 1 in 1000yr)risk events. the whole of the frontage of the site affected by all events.
As advised on comments for site "East of The Street.
Site on surface water flood flow path - 50% of site at risk.
Depths between 300-900mm for high (up to 1 in 30yr)medium (between 1 in 30 & 1 in 100yr) and low (between 1 in 100 & 1 in 1000yr)risk events. the whole of the frontage of the site affected by all events.
Object
New, Revised and Small Sites
GNLP2056
Representation ID: 17052
Received: 14/11/2018
Respondent: South Norfolk Council
Site on a surface water flood flow path affecting approx. 60% of the eastern side of the site and approx. 80% of frontage.
Depths generally below 300mm but ponding above 300mm for the low risk event.
Site on a surface water flood flow path affecting approx. 60% of the eastern side of the site and approx. 80% of frontage.
Depths generally below 300mm but ponding above 300mm for the low risk event.
Comment
New, Revised and Small Sites
GNLP2113
Representation ID: 17053
Received: 14/11/2018
Respondent: South Norfolk Council
low surface water flood risk across southern part of site
depths below 300mm for all events
low surface water flood risk across southern part of site
depths below 300mm for all events
Comment
New, Revised and Small Sites
GNLP2158
Representation ID: 17054
Received: 14/11/2018
Respondent: South Norfolk Council
The north-western part of the site is in Flood zones 2 & 3
The north-western part of the site is in Flood zones 2 & 3
Comment
New, Revised and Small Sites
GNLP2086
Representation ID: 17055
Received: 14/11/2018
Respondent: South Norfolk Council
Surface water flooding affecting south-western corner of site
Surface water flooding affecting south-western corner of site
Comment
New, Revised and Small Sites
GNLP2156
Representation ID: 17056
Received: 14/11/2018
Respondent: South Norfolk Council
Flood zones 2 & 3 adjacent to northern boundary
Flood zones 2 & 3 adjacent to northern boundary
Object
New, Revised and Small Sites
GNLP2138
Representation ID: 17057
Received: 14/11/2018
Respondent: South Norfolk Council
Flood zones 2 & 3 across approx. 60% of northern and north-eastern part of the site. Future flood risk should be assessed against the climate change scenarios
May be opportunity for development along site frontage.
Flood zones 2 & 3 across approx. 60% of northern and north-eastern part of the site. Future flood risk should be assessed against the climate change scenarios
May be opportunity for development along site frontage.
Comment
New, Revised and Small Sites
GNLPSL2008
Representation ID: 17058
Received: 14/11/2018
Respondent: South Norfolk Council
Surface water flood flow path inside northern boundary of site
Surface water flood flow path inside northern boundary of site