Object

Publication

HAR5 Policy

Representation ID: 23850

Received: 22/03/2021

Respondent: Anglian Water Services Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Change suggested by respondent:

POLICY GNLP0451
There is existing foul within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Add new paragraph to supporting text to read:

There is an existing foul sewer in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’

Add new criterion to Policy HAR 5:
‘the safeguarding of suitable access for the maintenance of foul drainage infrastructure'.

Full text:

There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Object

Publication

HAR6 Policy

Representation ID: 23851

Received: 22/03/2021

Respondent: Anglian Water Services Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

There is existing water main and foul and surface water sewers within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Change suggested by respondent:

Add new paragraph to supporting text to read:

There is an existing water main and foul and surface water sewer in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’

Add new criterion to Policy HAR 6:
‘the safeguarding of suitable access for the maintenance of water supply, foul and surface water drainage infrastructure.’

Full text:

There is existing water main and foul and surface water sewers within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Object

Publication

0378R/2139R Policy

Representation ID: 23852

Received: 22/03/2021

Respondent: Anglian Water Services Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

There is existing water mains within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Change suggested by respondent:

Add new paragraph to supporting text to read:

There are existing water mains in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’

Add new criterion to Contingency Site Policy GNLP0378R/2139R:
‘the safeguarding of suitable access for the maintenance of water supply infrastructure.’

Full text:

There is existing water mains within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Object

Publication

ACL1 Policy

Representation ID: 23853

Received: 22/03/2021

Respondent: Anglian Water Services Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

There is existing water main within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Change suggested by respondent:

Add new paragraph to supporting text to read:

There is an existing water main in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’

Add new criterion to Policy ACL1:
‘the safeguarding of suitable access for the maintenance of water supply infrastructure.’

Full text:

There is existing water main within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Object

Publication

BRU3 Policy

Representation ID: 23854

Received: 22/03/2021

Respondent: Anglian Water Services Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Change suggested by respondent:

Add new paragraph to supporting text to read:

There is an existing foul sewer in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’

Add new criterion to Policy BRU3:
‘the safeguarding of suitable access for the maintenance of foul drainage infrastructure.’

Full text:

There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Object

Publication

HET 3 Policy

Representation ID: 23856

Received: 22/03/2021

Respondent: Anglian Water Services Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

There is existing water main within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Change suggested by respondent:

There is existing foul within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Add new paragraph to supporting text to read:

There is an existing water main in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing water main should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’

Add new criterion to Contingency Site Policy HET 3:
‘the safeguarding of suitable access for the maintenance of foul drainage infrastructure.’

Full text:

There is existing water main within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Object

Publication

HIN2 Policy

Representation ID: 23857

Received: 22/03/2021

Respondent: Anglian Water Services Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

There is existing surface water sewer and related discharge point within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Change suggested by respondent:

There is existing foul within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Add new paragraph to supporting text to read:

There is an existing surface water sewer and related discharge point in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing sewer is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’

Add new criterion to Contingency Site Policy HIN2:
‘the safeguarding of suitable access for the maintenance of surface water drainage infrastructure.’

Full text:

There is existing surface water sewer and related discharge point within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Object

Publication

LOD3 Policy

Representation ID: 23858

Received: 22/03/2021

Respondent: Anglian Water Services Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

There are existing foul and surface water sewers within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Change suggested by respondent:

There is existing foul and surface water sewers within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Add new paragraph to supporting text to read:

There is an existing foul and surface water sewers in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’

Add new criterion to Contingency Site Policy LOD3:
‘the safeguarding of suitable access for the maintenance of foul and surface water drainage infrastructure.’

Full text:

There are existing foul and surface water sewers within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Object

Publication

BLO5 Policy

Representation ID: 23860

Received: 22/03/2021

Respondent: Anglian Water Services Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Change suggested by respondent:

Add new paragraph to supporting text to read:

There is an existing foul sewer in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewer should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’

Add new criterion to Contingency Site Policy BLO5:
‘the safeguarding of suitable access for the maintenance of foul drainage infrastructure.’

Full text:

There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Object

Publication

0297 Policy

Representation ID: 23861

Received: 22/03/2021

Respondent: Anglian Water Services Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

There is existing rising main (pressurised sewer) within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Change suggested by respondent:

There is existing foul within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.

Add new paragraph to supporting text to read:

There is an existing rising main (pressurised sewer) in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’

Add new criterion to Contingency Site Policy GNLP0297:
‘the safeguarding of suitable access for the maintenance of foul drainage infrastructure.’

Full text:

There is existing rising main (pressurised sewer) within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.