Publication
Search representations
Results for Anglian Water Services Ltd search
New searchObject
Publication
HAR5 Policy
Representation ID: 23850
Received: 22/03/2021
Respondent: Anglian Water Services Ltd
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
POLICY GNLP0451
There is existing foul within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Add new paragraph to supporting text to read:
There is an existing foul sewer in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’
Add new criterion to Policy HAR 5:
‘the safeguarding of suitable access for the maintenance of foul drainage infrastructure'.
There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Object
Publication
HAR6 Policy
Representation ID: 23851
Received: 22/03/2021
Respondent: Anglian Water Services Ltd
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
There is existing water main and foul and surface water sewers within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Add new paragraph to supporting text to read:
There is an existing water main and foul and surface water sewer in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’
Add new criterion to Policy HAR 6:
‘the safeguarding of suitable access for the maintenance of water supply, foul and surface water drainage infrastructure.’
There is existing water main and foul and surface water sewers within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Object
Publication
0378R/2139R Policy
Representation ID: 23852
Received: 22/03/2021
Respondent: Anglian Water Services Ltd
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
There is existing water mains within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Add new paragraph to supporting text to read:
There are existing water mains in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’
Add new criterion to Contingency Site Policy GNLP0378R/2139R:
‘the safeguarding of suitable access for the maintenance of water supply infrastructure.’
There is existing water mains within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Object
Publication
ACL1 Policy
Representation ID: 23853
Received: 22/03/2021
Respondent: Anglian Water Services Ltd
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
There is existing water main within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Add new paragraph to supporting text to read:
There is an existing water main in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’
Add new criterion to Policy ACL1:
‘the safeguarding of suitable access for the maintenance of water supply infrastructure.’
There is existing water main within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Object
Publication
BRU3 Policy
Representation ID: 23854
Received: 22/03/2021
Respondent: Anglian Water Services Ltd
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Add new paragraph to supporting text to read:
There is an existing foul sewer in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’
Add new criterion to Policy BRU3:
‘the safeguarding of suitable access for the maintenance of foul drainage infrastructure.’
There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Object
Publication
HET 3 Policy
Representation ID: 23856
Received: 22/03/2021
Respondent: Anglian Water Services Ltd
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
There is existing water main within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
There is existing foul within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Add new paragraph to supporting text to read:
There is an existing water main in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing water main should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’
Add new criterion to Contingency Site Policy HET 3:
‘the safeguarding of suitable access for the maintenance of foul drainage infrastructure.’
There is existing water main within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Object
Publication
HIN2 Policy
Representation ID: 23857
Received: 22/03/2021
Respondent: Anglian Water Services Ltd
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
There is existing surface water sewer and related discharge point within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
There is existing foul within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Add new paragraph to supporting text to read:
There is an existing surface water sewer and related discharge point in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing sewer is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’
Add new criterion to Contingency Site Policy HIN2:
‘the safeguarding of suitable access for the maintenance of surface water drainage infrastructure.’
There is existing surface water sewer and related discharge point within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Object
Publication
LOD3 Policy
Representation ID: 23858
Received: 22/03/2021
Respondent: Anglian Water Services Ltd
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
There are existing foul and surface water sewers within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
There is existing foul and surface water sewers within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Add new paragraph to supporting text to read:
There is an existing foul and surface water sewers in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’
Add new criterion to Contingency Site Policy LOD3:
‘the safeguarding of suitable access for the maintenance of foul and surface water drainage infrastructure.’
There are existing foul and surface water sewers within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Object
Publication
BLO5 Policy
Representation ID: 23860
Received: 22/03/2021
Respondent: Anglian Water Services Ltd
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Add new paragraph to supporting text to read:
There is an existing foul sewer in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewer should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’
Add new criterion to Contingency Site Policy BLO5:
‘the safeguarding of suitable access for the maintenance of foul drainage infrastructure.’
There is existing foul sewer within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Object
Publication
0297 Policy
Representation ID: 23861
Received: 22/03/2021
Respondent: Anglian Water Services Ltd
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
There is existing rising main (pressurised sewer) within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
There is existing foul within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.
Add new paragraph to supporting text to read:
There is an existing rising main (pressurised sewer) in Anglian Water’s ownership within the boundary of the site and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located in private gardens where access for maintenance and repair could be restricted. The existing sewers should be located in highways or public open space. If this is not possible a formal application to divert Anglian Water’s existing assets may be required.’
Add new criterion to Contingency Site Policy GNLP0297:
‘the safeguarding of suitable access for the maintenance of foul drainage infrastructure.’
There is existing rising main (pressurised sewer) within the boundary of the site. We would ask that this be considered as part of the site design and layout to ensure that we can continue to serve our customers. In the event that there is a need to divert our existing assets a formal application to Anglian Water would be required.