GNLP 2045 Regulation 20 Scoping Consultation

Search representations

Results for Environment Agency (Eastern Region) search

New search New search

Comment

GNLP 2045 Regulation 20 Scoping Consultation

Question 1 – Are there any

Representation ID: 26659

Received: 28/09/2026

Respondent: Environment Agency (Eastern Region)

Representation Summary:

Flood risk
- Flood risk isn't mentioned as a threat to communities across the Greater Norwich Area.
- Climate change should be recognised as a threat
- Challenges around growth largely attributed to environmental constraints - a reminder that the natural world is under significant pressure from development and climate change.
- Water resource constraints correctly listed as threat

Water Resources
- threat around utilities and water resource constraints is appropriate and should be retained. Make clear this includes timing and deliverability, reliance on demand reduction and risk that growth comes forward faster than infrastructure.
- Additional opportunity - coordinated regional and water company planning together with higher water efficiency can support sustainable growth while improving drought resilience and reducing pressure on the water environment.

Water Quality
- Utilities constraints are listed under threats, assume this includes wastewater treatment. A number of WWTWs have limited or no capacity in Greater Norwich Area so this should be a significant consideration.

Climate Change
- Climate mitigation and adaptation policies should be incorporated.
- The Plan should promote sustainable design, nature based solutions and SuDS where possible
- Climate resilience needs to be full considered as part of new development
- Consider options for increased uptake of renewables
(See full rep for detail)

Comment

GNLP 2045 Regulation 20 Scoping Consultation

Question 2 – Is there any

Representation ID: 26660

Received: 28/09/2026

Respondent: Environment Agency (Eastern Region)

Representation Summary:

Water Resources
Baseline should include:
- latest Anglian Water WRMP24 evidence and its developing WRMP29 position;
- Water Resources East regional plan;
- relevant Water Resource Zone (WRZ) supply-demand balances and drought resilience;
- strategic supply scheme dependencies and delivery dates;
- current and forecast household and non-household demand;
- known local network constraints where available.
The assessment should also consider cumulative growth outside Greater Norwich where it draws on the same WRZs or strategic supply system. The proposed housing uplift is material, so the baseline should not rely only on
forecasts prepared before the new housing requirement. The 593 Ml/d deficit quoted in the consultation should also be clearly described as a wider regional/water-company scale figure and not as a Greater Norwich-specific
deficit.

Water Quality
•Essential baseline data for Water Quality includes Dry Weather Flow data (provided by Anglian Water) and Water Framework Directive (WFD) classification data (the 2025 classification will be uploaded to Catchment Data
Explorer December 2026 but is available externally here:
https://engageenvironmentagency.uk.engagementhq.com/understanding-englands-water-environment)
(See full rep for details)

Comment

GNLP 2045 Regulation 20 Scoping Consultation

Question 5

Representation ID: 26661

Received: 28/09/2026

Respondent: Environment Agency (Eastern Region)

Representation Summary:

Groundwater and Contaminated Land
• Support maximising brownfield development.
•The Plan should protect people and the environment by tackling land contamination and water pollution
through a risk-based approach to defining contaminated land
• The Plan should steer potentially polluting development away from the most sensitive areas (i.e. SPZs and drinking water supplies)

Ecology and Biodiversity
• Brownfield sites can be valuable for both ecology and the local community and their retention should not necessarily be seen as a barrier to growth.
• Some brownfield sites are exceptionally rich in wildlife
• It may be necessary to replicate such habitats while redeveloping brownfield sites, for example through the use of brown roofs, bat boxes etc.
• It is important that any development on or directly adjacent to such sites is supported by a thorough environmental assessment.

Water Resources
• Brownfield development can be supported where sustainable potable water supply can be demonstrated.
• The Growth Strategy should favour development which minimises potable demand through high water efficiency supplied in step with planned water-resource and network infrastructure.

Water Quality
• The Plan should look to locate growth around where there is existing waste water treatment capacity or where there are planned improvements
(See full rep for details)

Comment

GNLP 2045 Regulation 20 Scoping Consultation

Question 6

Representation ID: 26662

Received: 28/09/2026

Respondent: Environment Agency (Eastern Region)

Representation Summary:

Flood Risk
• Plan must be clear on the types of development that could be permitted in areas of flood risk and the level of required mitigation.
• The sequential test must be applied to avoid inappropriate development in areas at risk of flooding by directing development away from areas at highest risk.
• The Plan should look to reduce the causes and impacts of flooding through new development
• Ensure SuDS schemes are acceptable
• Help developers to bring forward proposals that are much more likely to be acceptable by being clear on the requirements for different development types in areas at flood risk.
• Careful consideration must be given to existing flood defence assets,
• An updated Strategic Flood Risk Assessment (SFRA) will be essential to inform the location and nature of development across the area.

Ecology and Biodiversity
• Where sites include existing watercourses, a riparian corridor should be retained. All development must ensure that watercourses are protected from pollution during and after construction.

Regulated Sites
• The Plan should ensure that proposals in proximity to regulated sites are appropriate.

Water Resources and Water Quality
• We do not recommend identifying particular areas for additional growth on water resources or quality grounds at this scoping stage. A Level 1 and Level
2 Water Cycle Study (WCS) should test the different spatial growth options.
• Where new or reinforced infrastructure is needed, the phasing of development should be aligned with the point at which that infrastructure can reliably be
available.
(See full rep for details)

Comment

GNLP 2045 Regulation 20 Scoping Consultation

Question 7

Representation ID: 26663

Received: 28/09/2026

Respondent: Environment Agency (Eastern Region)

Representation Summary:

Water Resources and Water Quality
• We do not suggest a change to the settlement hierarchy solely on water resources or quality grounds at this stage. However, water resource, water supply and foul drainage infrastructure constraints should be an explicit criterion when testing the hierarchy and distribution of growth.
• Higher-order settlements should not automatically be assumed to have greater spare water-supply or water treatment capacity, and dispersed growth may also create cumulative network and resource pressures.
• If the WCS identifies material differences between growth locations, these should be reflected in the final spatial strategy and phasing.

Comment

GNLP 2045 Regulation 20 Scoping Consultation

Question 15

Representation ID: 26664

Received: 28/09/2026

Respondent: Environment Agency (Eastern Region)

Representation Summary:

Water Resources and Water Quality
• The Infrastructure section currently refers to the WCS mainly in relation to WWTW improvements. The WCS should be clearly described as covering the full water cycle, additionally including potable water resources, supplydemand balance, network capacity, water efficiency and infrastructure/phasing.
• The Plan should support and, where necessary, safeguard strategic water supply infrastructure identified through Water Resource Management Plan/regional planning evidence, including reservoirs, transfers or other
options where relevant.

Ecology and Biodiversity
• Consideration should be given to ecology and biodiversity when designing roads and paths in order to avoid habitat loss, fragmentation and disturbance
to sensitive habitats and species. We recommend early consultation with the Environment Agency and other relevant bodies (such as Natural England) for proposals for the location of roads and public paths where these routes may impact sensitive sites, habitats and/or species.
• Any proposed new highways or changes to highways should incorporate pollution control structures that are suitably designed, maintained and adopted in order to minimise the pollution risks.

Comment

GNLP 2045 Regulation 20 Scoping Consultation

Question 16

Representation ID: 26665

Received: 28/09/2026

Respondent: Environment Agency (Eastern Region)

Representation Summary:

Water Quality
• The proposed WCS will be essential in assessing wastewater treatment capacity and nutrient neutrality.
• Planning site allocations and phasing timelines around existing planned improvements will help ensure capacity is available.
• As well as capacity at WWTW, the Plan should also consider and seek to mitigate issues surrounding rural sewage disposal methods
• Where mains foul drainage is proposed, consideration should be given to ensuring the site is located within an area where a mains connection is available.

Flood Risk
• Consideration must be given to the potential increase in flood risk to critical infrastructure due to climate change, and any associated reduction in the level of protection provided by existing flood defence assets.

Water Resources
• Potable water supply should also be treated as critical enabling infrastructure.
• The Plan should distinguish strategic water-resource availability from local water-network capacity.
• The new Plan should require monitoring of both the water-efficiency standard achieved in new development and progress/delivery of strategic water-supply
infrastructure that the growth strategy depends on.

Groundwater Protection
• Regarding clean power and net zero objectives:
o We anticipate an increased number of ground source heat pumps installed as lower carbon alternatives.
o Ground source heat pumps change the temperature in the ground and the water environment which could have impacts on the water quality or aquatic ecology.
o An increase of Battery Energy Storage System (BESS)
developments is likely.
• The Plan should ensure adequate cemetery provision is addressed, with reference to Cemeteries and burials: groundwater risk assessments and our Groundwater Protection Position Statements

Climate Change
• Nature Based Solutions are a key component in the delivery of Net Zero and policy should be carefully considered to ensure maximum use of this type of
intervention.
(See full rep for details)

Comment

GNLP 2045 Regulation 20 Scoping Consultation

Question 17

Representation ID: 26666

Received: 28/09/2026

Respondent: Environment Agency (Eastern Region)

Representation Summary:

Water Resources
• Strongly support the GNLP 2045 setting the most demanding locally justified water-efficiency standards.
• Rainwater harvesting and water reuse should be considered but should complement rather than replace efficient fittings and demand reduction.

Water Quality
• The Plan should include extensive measures to protect and improve water quality, including development requirements.
• Increased periods of heavy rainfall can exacerbate existing sewage infrastructure issues and the resulting threats to water quality. Measures to minimise this risk should therefore be considered for both new development
and existing buildings

Ecology and Biodiversity
• Plan should include the provision of green/blue infrastructure to ensure that habitats are linked where appropriate
• Biodiversity Net Gain (BNG) should be a strategic objective of the Plan and site allocations should offer potential to provide green/blue infrastructure
that can deliver biodiversity benefits.
• Plan should include the requirement for Biodiverse SuDS to maximise the onsite habitat potential.  
• Plan should help wildlife adapt to climate change
• Welcome the reference to the Green Infrastructure Strategy. Development should also be guided by the Local Nature Recovery Strategy.
• Strongly support the Plan including higher or new standards for nature recovery.
• Welcome the inclusion of ‘Notable species in Greater Norwich’ in this section.
• Planting schemes should utilise tree species of local provenance, with the inclusion of drought-resistant species where appropriate to ensure long-term establishment, adaptability, and resilience to changing climatic conditions.
• Any further green/blue access within the riparian corridor should be discussed with all relevant stakeholders at the earliest opportunity.

Groundwater Protection
• Source Protection Zones are delineated across most of the area for the protection of water supplies. These features should be recognised and safeguarded.
• Appropriately located and designed infiltration features can play a key role in supporting aquifer recharge and reducing flooding.
(See full rep for details)

Comment

GNLP 2045 Regulation 20 Scoping Consultation

Question 19

Representation ID: 26667

Received: 28/09/2026

Respondent: Environment Agency (Eastern Region)

Representation Summary:

Flood Risk
• Pleased that new/updated SFRAs have been acknowledged as a necessary requirement. Use the Environment Agency’s detailed charged advice service to request advice
• Recommend working collaboratively with neighbouring authorities
• Plan should also be supported by a Sequential and Exception Test document. Note this is not currently listed among the proposed evidence studies.

Water Resources
• Support preparation of both Level 1 and Level 2 Water Cycle Studies, but the scope should explicitly cover water resources and potable water supply as well as wastewater.
• The WCS should test whether the proposed scale and spatial distribution of growth can be supplied sustainably under current and future WRZ conditions,
• Joint or closely coordinated work with neighbouring Norfolk authorities would be beneficial.
• The WCS should be treated as a live evidence base and updated before later Plan stages
• We also recommend that the WCS findings are carried directly into the Infrastructure Delivery Plan and site-selection evidence.

Water Quality
• Any WCS must include wastewater capacity assessment and baseline WFD information for each waterbody to enable effective establishment of policies
that will protect the quality of the water environment.
• We recommend that the WCS is treated as a living
document and reviewed/updated periodically throughout the Plan period
• The WCS will also need to include planned Anglian Water work and their DWMP.

Ecology and Biodiversity
• The Local Nature Recovery Strategy for Norfolk should be viewed as a fundamental document
• The Plan should refer to the RBMP to ensure proposed development considers and addresses impacts to the water environment and the wider catchment.

Groundwater Protection
• The Plan should have regard to Water Company Water Resource Management Plans and our groundwater protection hierarchy in order to protect groundwater resources.
(See full rep for detail)

Comment

GNLP 2045 Regulation 20 Scoping Consultation

Question 22 - Is there

Representation ID: 26668

Received: 28/09/2026

Respondent: Environment Agency (Eastern Region)

Representation Summary:

Water Resources
• Water resources should be treated as a spatial planning and deliverability issue, not only as a development-management matter. The final growth strategy should demonstrate that the timing and distribution of housing and
employment growth is compatible with sustainable water-resource availability and the delivery of any required network or strategic infrastructure.
• The Plan should include measurable outcomes for water efficiency and watersupply infrastructure delivery, with monitoring and review triggers where strategic scheme timing, Water Resource Management Plan assumptions, or demand forecasts change. Early and continuing engagement with Anglian Water, Water Resources East and the Environment Agency will be important throughout Plan preparation.

Waste
• The Plan should include policies that drive waste management up the waste hierarchy.
• The Plan should consider waste management alongside other spatial planning concerns, such as housing, transport, economic growth, natural resources, energy and regeneration.
• The Plan should reduce the amount of construction and demolition waste produced during development by including policies that limit the amount of waste generated during the demolition and construction phases of
development. These policies should reflect industry best practice/certification wherever possible.
• The Plan should ensure that adequate waste management is provided for in new developments through policies that provide sustainable waste management for all development types

For instructions on how to use the system and make comments, please see our help guide.